Slickdeals is community-supported.  We may get paid by brands for deals, including promoted items.
forum thread
Bojjihuntindeals | Staff 956 Views
Nov 16, 2026 10:19 PM

44" Lifetime Impact Portable Adjustable Basketball Hoop (Model 90759) $99 + Free Shipping w/ Walmart+ or on $35+

$99

$220

55% off
Walmart
Get Deal at Walmart
Good Deal?
0Comments
Save
Share
Deal Details
Walmart [walmart.com] has 44" Lifetime Impact Portable Adjustable Basketball Hoop (Model 90759) on sale for $99. Shipping is free w/ Walmart+ ($1 trial available [walmart.com]) or on orders $35+.

Compiled From Merchant's Product Page:
  • Specs:
    • Model: 90759
    • Backboard size: 44"
    • Backboard material: High-density polyethylene (Impact)
    • Rim: 18" Classic, 5/8" solid-steel ring with 1/2" braces
    • Height adjustment range: 7.5 ft. to 10 ft. in 6" increments
    • Adjustment type: Telescoping (no tools required)
    • Pole: 3-piece, 2.75" round steel with powder-coated finish
    • Base type: Pro-Court, 27-gallon (sand or water fill, no cement required)
    • Base dimensions: 43.2" x 30" x 6.5"
    • Weight: 52 lbs
    • Warranty: 5-Year Limited
  • Features:
    • Backboard graphics screen-printed with UV-protected inks
    • All-weather net included
    • Portable base allows relocation without permanent installation
    • Suitable for yard, driveway, or home court use
Community Notes
About the Poster
Deal Details
Community Notes
About the Poster
Walmart [walmart.com] has 44" Lifetime Impact Portable Adjustable Basketball Hoop (Model 90759) on sale for $99. Shipping is free w/ Walmart+ ($1 trial available [walmart.com]) or on orders $35+.

Compiled From Merchant's Product Page:
  • Specs:
    • Model: 90759
    • Backboard size: 44"
    • Backboard material: High-density polyethylene (Impact)
    • Rim: 18" Classic, 5/8" solid-steel ring with 1/2" braces
    • Height adjustment range: 7.5 ft. to 10 ft. in 6" increments
    • Adjustment type: Telescoping (no tools required)
    • Pole: 3-piece, 2.75" round steel with powder-coated finish
    • Base type: Pro-Court, 27-gallon (sand or water fill, no cement required)
    • Base dimensions: 43.2" x 30" x 6.5"
    • Weight: 52 lbs
    • Warranty: 5-Year Limited
  • Features:
    • Backboard graphics screen-printed with UV-protected inks
    • All-weather net included
    • Portable base allows relocation without permanent installation
    • Suitable for yard, driveway, or home court use

Community Voting

Deal Score
+3
Good Deal
Bad Deal

Price Intelligence

Deal History

Sale Price
Slickdeal
  • $NaN
  • Today

Join The Conversation

Share your experience with the Slickdeals community

Share information with the community. Please follow our Community Guidelines and be kind!

0 Comments

Be the first to comment.

Join The Conversation

Share your experience with the Slickdeals community

Share information with the community. Please follow our Community Guidelines and be kind!