This project has been on the Honey-do list since the day we moved into this house back in August of 2005. Our dining room is pretty hideous. The previous owners used it as an office and cut holes in the walls, etc.
The color on the walls is nice, but that's the only good thing to say about it, really.
So far we haven't done much except replace the stupid little light that was in the room with a chandelier we got on Amazon.com for $26. It's stainless and matches the rest of the lights in the house, so we like it. We were considering buying a nearly identical chandelier from Lowe's for like $350, and honestly we like that one a bit better, for for $26 for the one we got we really couldn't be much happier.
So since I got laid off from my job I figured I'd take almost two weeks off before starting the new job and tackle this project. First up is priming the walls and removing the awful head-cap from over the window.
Next is pulling up the carpet and staples and removing the baseboards.
Then I'll either install the hardwood or fix all the holes in the walls, not sure which direction I'll go next, but both will hopefully be done by the end of next week.
Later, I'll be wainscoting the dining room, but I have to pick a pattern first. I'm not sure what I want to do just yet.
I also intend to install an in-wall display case for my wife's butterfly art. This will also include some new lighting to show off her collection. That'll probably happen before the wainscoting, and indeed may even drive the wainscoting design.
I've uploaded a few pictures of what I am starting with. I'll post more as I go along, just like before.
The color on the walls is nice, but that's the only good thing to say about it, really.
So far we haven't done much except replace the stupid little light that was in the room with a chandelier we got on Amazon.com for $26. It's stainless and matches the rest of the lights in the house, so we like it. We were considering buying a nearly identical chandelier from Lowe's for like $350, and honestly we like that one a bit better, for for $26 for the one we got we really couldn't be much happier.

So since I got laid off from my job I figured I'd take almost two weeks off before starting the new job and tackle this project. First up is priming the walls and removing the awful head-cap from over the window.
Next is pulling up the carpet and staples and removing the baseboards.
Then I'll either install the hardwood or fix all the holes in the walls, not sure which direction I'll go next, but both will hopefully be done by the end of next week.
Later, I'll be wainscoting the dining room, but I have to pick a pattern first. I'm not sure what I want to do just yet.
I also intend to install an in-wall display case for my wife's butterfly art. This will also include some new lighting to show off her collection. That'll probably happen before the wainscoting, and indeed may even drive the wainscoting design.
I've uploaded a few pictures of what I am starting with. I'll post more as I go along, just like before.
139 Comments
Your comment cannot be blank.
Sign up for a Slickdeals account to remove this ad.
It seems as though the world is working against me finishing this floor in time.
It seems as though the world is working against me finishing this floor in time.
I'm only two rows from where I was before. If things go my way tomorrow, I should actually be able to finish it before I go to bed tomorrow night.
If.
Sign up for a Slickdeals account to remove this ad.
I thought particle board was for walls?
I think I could have gotten it nearly finished in a couple more hours. That's okay though, since I can hardly move anyway. I'll come home from work a bit early tomorrow and finish it up.
Anyway, I'm excited, the floor is looking great. We should be able to get all the furniture moved into the dining room tomorrow night and get the carpet pulled up in the great room. That will leave me with Wednesday night to pull all the staples and clean the floor really good, and screw down all the squeaky boards in the great room before carpet is installed on Friday.
I'll probably have to take the day off on Thursday though to get it all done in time.