This project has been on the Honey-do list since the day we moved into this house back in August of 2005. Our dining room is pretty hideous. The previous owners used it as an office and cut holes in the walls, etc.
The color on the walls is nice, but that's the only good thing to say about it, really.
So far we haven't done much except replace the stupid little light that was in the room with a chandelier we got on Amazon.com for $26. It's stainless and matches the rest of the lights in the house, so we like it. We were considering buying a nearly identical chandelier from Lowe's for like $350, and honestly we like that one a bit better, for for $26 for the one we got we really couldn't be much happier.
So since I got laid off from my job I figured I'd take almost two weeks off before starting the new job and tackle this project. First up is priming the walls and removing the awful head-cap from over the window.
Next is pulling up the carpet and staples and removing the baseboards.
Then I'll either install the hardwood or fix all the holes in the walls, not sure which direction I'll go next, but both will hopefully be done by the end of next week.
Later, I'll be wainscoting the dining room, but I have to pick a pattern first. I'm not sure what I want to do just yet.
I also intend to install an in-wall display case for my wife's butterfly art. This will also include some new lighting to show off her collection. That'll probably happen before the wainscoting, and indeed may even drive the wainscoting design.
I've uploaded a few pictures of what I am starting with. I'll post more as I go along, just like before.
The color on the walls is nice, but that's the only good thing to say about it, really.
So far we haven't done much except replace the stupid little light that was in the room with a chandelier we got on Amazon.com for $26. It's stainless and matches the rest of the lights in the house, so we like it. We were considering buying a nearly identical chandelier from Lowe's for like $350, and honestly we like that one a bit better, for for $26 for the one we got we really couldn't be much happier.

So since I got laid off from my job I figured I'd take almost two weeks off before starting the new job and tackle this project. First up is priming the walls and removing the awful head-cap from over the window.
Next is pulling up the carpet and staples and removing the baseboards.
Then I'll either install the hardwood or fix all the holes in the walls, not sure which direction I'll go next, but both will hopefully be done by the end of next week.
Later, I'll be wainscoting the dining room, but I have to pick a pattern first. I'm not sure what I want to do just yet.
I also intend to install an in-wall display case for my wife's butterfly art. This will also include some new lighting to show off her collection. That'll probably happen before the wainscoting, and indeed may even drive the wainscoting design.
I've uploaded a few pictures of what I am starting with. I'll post more as I go along, just like before.
139 Comments
Your comment cannot be blank.
Sign up for a Slickdeals account to remove this ad.
10 if he paints it peach -- because he'll have to repaint..
Paint is still wet so plate covers are not back on, and I still have to put the half-round beauty boxes in but I'll get that done after Christmas. We are putting the tree up this evening so work will continue after the tree comes down.
Doing this project I learned about how to do coping cuts (never done them before, they're pretty easy and quite effective), and the amazing powers of painter's caulk.
http://www.theperfumes